I felt the inclination to respond to this in case I could further clarify what was being pointed to here. Correct me if I’m wrong but I believe an effective solution to this problem was presented by Accel0001 and it seems to have been overlooked.
The solution works for me as follows:
- Open Project Logical Editor
–
UPPER HALF OF PROJECT LOGICAL EDITOR WINDOW: - Under the “Filter Target” column, select “Container Type is”
- Under the “Condition” column, select “Equal”
- Under the “Parameter 1” column, select “Track”
–
LOWER HALF OF PROJECT LOGICAL EDITOR WINDOW: - Under the “Action Target” column, select “Track Operation”
- Under the “Operation” column, select “Lanes Active”
- Under the “Parameter 1” column, select “Disable”
–
BOTTOM OF PROJECT LOGICAL EDITOR WINDOW: - Set the “Function” dropdown option to “Transform”
- Open lanes on a few tracks and click the “Apply” button in PLE to test and ensure it’s working as intended
–
TOP OF PROJECT LOGICAL EDITOR WINDOW: - Click the small “+” button and give it a name such as “Close All Lanes” and click “OK”
– - Now this newly created Project Logical Editor preset will be available in the key commands under the name you gave it under “Process Project Logical Editor”