I think I have found a bug. The duration of my project is 70’38", but the result of using the duration token is 10’38". It looks like the token doesn’t work for projects longer than 60 minutes and only considers the surplus after that time.
Antonio
2 Likes
I can confirm this behaviour.
I opened a project and kept on duplicating flows until the duration exceeded 60 minutes, then continued until the duration exceeded 2 hours. In both cases, the time displayed by the duration token was the time in excess of the most recent multiple of 60 minutes. So, for a project which was 97 minutes and 25 seconds long it showed 37’ 25", while for a project lasting 135 minutes and 44 seconds it displayed 15’ 44".
Yes, we spotted this ourselves recently. It will be fixed in the next update.
4 Likes
Yes, we spotted this ourselves recently. It will be fixed in the next update.
Fantastic!